INVENTORY OF HAZARDOUS MATERIALS

An insight into the different steps of an IHM inspection

PREPARATION FOR INSPECTION

Collection of vessel data and preparation of VSCP

Data sources can be GA, insulation plan, fire plan, Material declarations.

Once VSCP is prepared the inspection can take place.

THE ONBOARD INSPECTION

The inspection is normally carried out in one day and can be carried out even with short port stays by utilizing 2 inspectors.

FINALIZING OF REPORT

After inspections samples are sent to laboratory for testing. Once lab results are received a report will be issued and sent to owner. Report will at a minimum include: VSCP, Location plan, IHM report, Lab results, and MD sourced from manufacturers.

Report will be sent to owner that sends it on too Class Societe or flag administration for final approval.

MAINTENANCE OF IHM PART I

Once IHM report is approved the maintenance process starts this will be carried out until the end of the vessel’s lifetime.

C Survey supports our customer with at tailored fit solution.